- We invite Paula’s father around and what does he do, makes a mess of our back yard.
- Okay okay that one is plum and straight…
- Cleaning out dado with chisel
- Cutting dado out with circular saw.
- thirsty work… digging all theses holes… oh wait Roley doing the work… lol
- The foreman ensuring everything is correct.
- Removing old vege garden and digging more piles
- The old vege garden… that a fair bit of dirt to remove.
- concreting.. just add water. Roley digging more pile holes.
- Carpet laid. wait what? (free weed mat)
- First joist
- Few more joists
- bolting the face boards… it not coming off…
-
ummm hmmm is Roleys fault…
- Looking down on to the new lower deck from the upper deck
- Looking from lower concrete patio
- Few more to go…
- Hmmm my tape measure is around somewhere…?
- Spare parts
- Better have a tidy up.
- Just needs the rest of the balustrades
- Storing deck furniture and BBQ waiting for the new deck furniture to arrive.
- From behind the bar looking out onto the deck
- and a few more
The deck is 6.6m (21.65ft) wide and from the patio it is 3.6m (11.81ft) out
22 Piles. (H5 treated 100mm x 100mm or 4″x 4″)
15 Joists. (H3 treated 150mm x 50mm or 6″ x 2″)
4 Bearers. (H3 treated 100mm x 100mm or 4″x 4″)
20 Joist hangers.
80 Nail plates.
345m of 40mm (H3 treated) decking.
1560 19g 75mm deck screws.
24 150mm coach bolts.
40-50 100mm 14g tex screws
- Main deck lights up and wired in.
- Three in deck LED’s deck lighting.
- Three in deck LED’s deck lighting.
- Three in deck LED’s deck lighting.